Khoo Teck Puat Hospital |
Medical Gas System |
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
|
|
A&A work for Medical Gas Pipe System at KTPH - Tower B - Level 9 |
National Cancer Centre Singapore |
Medical Gas System |
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
|
|
A&A work for Medical Gas Pipe System at NCC - Level 16 - New Rehab Gym |
Mt. Elizabeth Hospital |
Medical Gas System |
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
|
|
Medical Gas Pipe System at Mt. Elizabeth Hospital |
Mt. Elizabeth Hospital |
Medical Gas System |
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
|
|
Dismantle & disposal of existing gas pipeline |
Mt. Elizabeth Hospital |
Medical Gas System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
Medical Gas Pipe System at Mt. Elizabeth Hospital |
Singapore General Hospital |
Medical Gas System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
Installation of Medical Gas Pipeline at SGH - SERI Lab |
Mt. Elizabeth Hospital |
Medical Gas System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
Installation of Gas Pipeline at MEH |
Woodlands Health Campus |
Medical Gas System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
BHP supply |
National Cancer Centre Singapore |
Medical Gas System |
|
|
2021 |
|
|
|
|
|
|
|
|
|
|
|
|
A&A work for Medical Gas Pipe System at NCC |
National Cancer Centre Singapore |
Medical Gas System |
|
|
2020 |
|
|
|
|
|
|
|
|
|
|
|
|
A&A work for Medical Gas Pipe System |
National University of Singapore |
Laboratory Gas System |
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory Gas Pipeline work and Gases outlet at NUS - E7 - L5 |
National University of Singapore |
Laboratory Gas System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory Gas Pipe System at NUS SNRSI |
National Research Foundation Singapore |
Laboratory Gas System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory Gas Pipe System at TUAS NRF |
National Cancer Centre Singapore |
Laboratory Gas System |
|
|
2022 |
|
|
|
|
|
|
|
|
|
|
|
|
Installation of RO Pipe for Laboratory Gas System at NCC |
National University of Singapore |
Laboratory Gas System |
|
|
2021 |
|
|
|
|
|
|
|
|
|
|
|
|
Installaation of Laboratory Gas Pipe Line at NUS |
National University of Singapore |
Laboratory Gas System |
|
|
2021 |
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory Gas Pipe System at E7 Building 8th storey - NUS |
NESTE |
Laboratory Gas System |
|
|
2021 |
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory Gas Pipe System - NESTE Laboratory |
National University of Singapore |
Laboratory Gas System |
|
|
2020 |
|
|
|
|
|
|
|
|
|
|
|
|
Gas pipe line system at Level 8 & Level 9 - NUS |
Veolia |
Laboratory Gas System |
|
|
2020 |
|
|
|
|
|
|
|
|
|
|
|
|
High pressure oxygen air pipe line works for main lab & satellite lab - Veolia |
National University of Singapore |
Laboratory Gas System |
|
|
2019 |
|
|
|
|
|
|
|
|
|
|
|
|
ADDITIONAL ARGON & C02 GASES PIPE LINE INSTALLATION at NUS - S9 L12-L16 |
National University of Singapore |
Laboratory Gas System |
|
|
2019 |
|
|
|
|
|
|
|
|
|
|
|
|
INSTALLATION OF GAS MANAGEMENT SYSTEM & GAS DETECTOR at NUS E7 |
National University of Singapore |
Laboratory Gas System |
|
|
2019 |
|
|
|
|
|
|
|
|
|
|
|
|
INSTALLATION OF GAS PIPE LINE SYSTEM at NUS-WSB S9 - L8 & L9 |
National University of Singapore |
Laboratory Gas System |
|
|
2018 |
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory gas pipe line system at 16th story Wet Lab - NUS |
Central |
Gas Management System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
Installation of GMS system at the Central Level 22 |
National University of Singapore |
Compressed Air System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
Installation of Compressed Air Pipeline at NUS E7 |
National Cancer Centre Singapore |
Laboratory Gas System |
|
|
2022 |
|
|
|
|
|
|
|
|
|
|
|
|
Installation of RO Pipe for Laboratory Gas System at NCC |
National University of Singapore |
Gas System |
|
|
2021 |
|
|
|
|
|
|
|
|
|
|
|
|
Flammable and H2 Gases Pipe line System at Blocks S9 - NUS |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
|
|
Supply Labour Tools to Install Hyena and Vienna System |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
|
|
Supply Labour Tools to Install Hyena and Vienna System |
Expand Construction Pte Ltd |
ACMV System |
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
|
|
Laboratory Gases Installation |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
ACMV Duct Work for Phase 3&4 |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
SIN 067 BBCS+PHASE1 - AMAZON DC SIN 67 FOR AC DUCT WORK & MV DUCT WORK |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
Phase-1 & BBCS Sin67 - CHW PIPE JOINT , CHILLED , PUMP & TANK INSULATION WORK |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
ACMV DUCT WORK INSTALLATION FOR LEVEL 2 - PHASE 2 (SIN 67) |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
SIN 67 BBCS+PHASE1+2 - ACMV Site Foaming Works for Phase 2 |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
ACMV SITE FOAMING WORKS FOR PHASE 2 - SIN 67 BBCS+PHASE1+2 |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
ACMV DUCT WORK INSTALLATION FOR PACKAGE B AT LEVEL 1 (OSP BUILDING) - PFIZER |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
Supply & Installation of Additional Sfety Mesh in AHU Gantry for BBCS+PHASE 1+2 |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
Supply & Installation of Additional Sfety Mesh in AHU Gantry for Phase 3+4 |
TOTAL FACILITY ENGINEERING PTE LTD |
ACMV System |
|
|
2022 |
|
|
|
|
|
|
|
|
|
|
|
|
INSTALLATION OF COMPRESSOR AIR PIPELINE & PROCESS VACUUM PIPELINE FOR CLASS 1K CLEAN RM |
TOTAL FACILITY ENGINEERING PTE LTD |
ACMV System |
|
|
2022 |
|
|
|
|
|
|
|
|
|
|
|
|
DUCTWORK & CHILLED WATER PIPE WORK FOR CLEAN RM , SERVER RM , OFFICE AREA & CORRIDOR |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2022 |
|
|
|
|
|
|
|
|
|
|
|
|
PU INSULATION & DRIP TRAY FOR CWS PIPE (SIN 67) |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2022 |
|
|
|
|
|
|
|
|
|
|
|
|
ACMV DUCT WORK FOR 7-STOREY DATA CENTRE (SIN 67) |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2022 |
|
|
|
|
|
|
|
|
|
|
|
|
GOOGLE - WEN 3 PROJECT LYW PHASE 1A ZONE 3 - HYENA & VIENNA INSTALLATION - LOK YANG WAY |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2022 |
|
|
|
|
|
|
|
|
|
|
|
|
WEN 3 PROJECT LYW PHASE 1A ZONE 3 - MV DUCT WORK INSTALLATION FOR LEVEL 1 CHILLER ROOM & LEVEL 4 GEN ROOM |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2022 |
|
|
|
|
|
|
|
|
|
|
|
|
HYENA & VIENNA INSTALLATION FOR ZONE 4 - LOK YANG WAY |
Crawfurd Hospital |
ACMV System |
|
|
2021 |
|
|
|
|
|
|
|
|
|
|
|
|
Installation of Quench Pipe & Emergency Exhaust Air System at CRAWFURD Hospital |
Teambuild Engineering & Construction Pte Ltd |
ACMV System |
|
|
2021 |
|
|
|
|
|
|
|
|
|
|
|
|
SUPPLY AND INSTALLATION OF FIRE-RATED VENT DUCT |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2021 |
|
|
|
|
|
|
|
|
|
|
|
|
ALMAC FUTURE EXPANSION FOR REFRIGERANT & DRAIN PIPE WORK |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2021 |
|
|
|
|
|
|
|
|
|
|
|
|
ALMAC FUTURE EXPANSION FOR DUCT WORK |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2020 |
|
|
|
|
|
|
|
|
|
|
|
|
WEN 3 PROJECT LYW PHASE 1A ZONE 3 - MV DUCT WORK INSTALLATION FOR LEVEL 1 CHILLER ROOM & LEVEL 4 GEN ROOM |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2020 |
|
|
|
|
|
|
|
|
|
|
|
|
INSULATION FOR CHOCOLATE TANKS & PU INSULATION WITH ALUMINIUM JACKETING FOR CHILLER PIPE AT MEIJI SEIKA - TUAS |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2020 |
|
|
|
|
|
|
|
|
|
|
|
|
GOOGLE-WEN3 PROJECT LYW PHASE 1A C&S + ZONE 1 ADDITIONAL & ALTERATION DUCTING WORK AT BATTERY ROOM |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2020 |
|
|
|
|
|
|
|
|
|
|
|
|
SINGLE-USER HI-TECH DATA PROCESSING & COMPUTING FACILITY DEVELOPMENT AT JUNCTION OF JURONG WEST AVENUE 2 (Z7) |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2020 |
|
|
|
|
|
|
|
|
|
|
|
|
GOOGLE-WEN3 PROJECT LYW PHASE 1A C&S + ZONE 2 INSTALLATION OF HYENA & VIENNA FOR ZONE 2 - LEVEL 3 |
ITS SCIENCE & MEDICAL PTE LTD |
ACMV System |
|
|
2020 |
|
|
|
|
|
|
|
|
|
|
|
|
ACMV & P&S WORK SYSTEM INSTALLATION FOR 1 LAB ROOM & OFFICE AREA |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2019 |
|
|
|
|
|
|
|
|
|
|
|
|
SINGLE-USER HI-TECH DATA PROCESSING & COMPUTING FACILITY DEVELOPMENT AT JUNCTION OF JURONG WEST AVENUE 2 (Z5) |
SNK (Asia Pacific) Pte Ltd |
ACMV System |
|
|
2019 |
|
|
|
|
|
|
|
|
|
|
|
|
GOOGLE-WEN3 PROJECT LYW PHASE 1A C&S + ZONE 1 INSTALLATION OF HYENA & VIENNA FOR ZONE 1 - LEVEL 2 |
AFPD PTE LTD |
M&E |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
Replacement of Heat Exchanger for RTO # 1 |
AFPD PTE LTD |
M&E |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
RTO 1 & 2 & THC SYSTEM MAINTENANCE SERVICE FOR 1st Jan 2023 ~ 31st Dec 2023 - AFPD |
C&W Services ( S ) Pte Ltd |
M&E |
|
|
2025 |
|
|
|
|
|
|
|
|
|
|
|
|
Replacement of Dehumidifier System |
C&W Services ( S ) Pte Ltd |
M&E |
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
|
|
Installation of ductile iron domestic water pipe |
ITS Science & Medical Pte Ltd |
M&E |
|
|
2022 |
|
|
|
|
|
|
|
|
|
|
|
|
INSTALLATION OF WASTE WATER PIPE & PUMP SYSTEM |
National University of Singapore |
M&E |
|
|
2022 |
|
|
|
|
|
|
|
|
|
|
|
|
P&S System and Fire Hydrant System Installation at NUS-COM 4 |
National University of Singapore |
M&E |
|
|
2021 |
|
|
|
|
|
|
|
|
|
|
|
|
FIRE HYDRANT SYSTEM INSTALLATION |
Total Facility Engineering Pte Ltd |
M&E |
|
|
2022 |
|
|
|
|
|
|
|
|
|
|
|
|
Replacement of RTO Heat Exchanger |
GREATEARTH CORPORATION PTE LTD |
M&E |
|
|
2020 |
|
|
|
|
|
|
|
|
|
|
|
|
INSTALLATION OF ELECTRICAL WIRING WORKS AND PLUMBING & SANITARY WORKS (C15) |
UBITECH HUB Pte Ltd |
Renovation Work |
|
|
2024 |
|
|
|
|
|
|
|
|
|
|
|
|
Reinstatement works level 6 Starhub Green |
UBITECH HUB Pte Ltd |
Renovation Work |
|
|
2023 |
|
|
|
|
|
|
|
|
|
|
|
|
Design and Built for Foodcourt at 67 Ubi |