PROJECT REFERENCE

M&E

Owner/Client/MainCon System Year Project Description
Khoo Teck Puat Hospital Medical Gas System 2024 A&A work for Medical Gas Pipe System at KTPH - Tower B - Level 9
National Cancer Centre Singapore Medical Gas System 2024 A&A work for Medical Gas Pipe System at NCC - Level 16 - New Rehab Gym
Mt. Elizabeth Hospital Medical Gas System 2024 Medical Gas Pipe System at Mt. Elizabeth Hospital
Mt. Elizabeth Hospital Medical Gas System 2024 Dismantle & disposal of existing gas pipeline
Mt. Elizabeth Hospital Medical Gas System 2023 Medical Gas Pipe System at Mt. Elizabeth Hospital
Singapore General Hospital Medical Gas System 2023 Installation of Medical Gas Pipeline at SGH - SERI Lab
Mt. Elizabeth Hospital Medical Gas System 2023 Installation of Gas Pipeline at MEH
Woodlands Health Campus Medical Gas System 2023 BHP supply
National Cancer Centre Singapore Medical Gas System 2021 A&A work for Medical Gas Pipe System at NCC
National Cancer Centre Singapore Medical Gas System 2020 A&A work for Medical Gas Pipe System
National University of Singapore Laboratory Gas System 2024 Laboratory Gas Pipeline work and Gases outlet at NUS - E7 - L5
National University of Singapore Laboratory Gas System 2023 Laboratory Gas Pipe System at NUS SNRSI
National Research Foundation Singapore Laboratory Gas System 2023 Laboratory Gas Pipe System at TUAS NRF
National Cancer Centre Singapore Laboratory Gas System 2022 Installation of RO Pipe for Laboratory Gas System at NCC
National University of Singapore Laboratory Gas System 2021 Installaation of Laboratory Gas Pipe Line at NUS
National University of Singapore Laboratory Gas System 2021 Laboratory Gas Pipe System at E7 Building 8th storey - NUS
NESTE Laboratory Gas System 2021 Laboratory Gas Pipe System - NESTE Laboratory
National University of Singapore Laboratory Gas System 2020 Gas pipe line system at Level 8 & Level 9 - NUS
Veolia Laboratory Gas System 2020 High pressure oxygen air pipe line works for main lab & satellite lab - Veolia
National University of Singapore Laboratory Gas System 2019 ADDITIONAL ARGON & C02 GASES PIPE LINE INSTALLATION at NUS - S9 L12-L16
National University of Singapore Laboratory Gas System 2019 INSTALLATION OF GAS MANAGEMENT SYSTEM & GAS DETECTOR at NUS E7
National University of Singapore Laboratory Gas System 2019 INSTALLATION OF GAS PIPE LINE SYSTEM at NUS-WSB S9 - L8 & L9
National University of Singapore Laboratory Gas System 2018 Laboratory gas pipe line system at 16th story Wet Lab - NUS
Central Gas Management System 2023 Installation of GMS system at the Central Level 22
National University of Singapore Compressed Air System 2023 Installation of Compressed Air Pipeline at NUS E7
National Cancer Centre Singapore Laboratory Gas System 2022 Installation of RO Pipe for Laboratory Gas System at NCC
National University of Singapore Gas System 2021 Flammable and H2 Gases Pipe line System at Blocks S9 - NUS
SNK (Asia Pacific) Pte Ltd ACMV System 2024 Supply Labour Tools to Install Hyena and Vienna System
SNK (Asia Pacific) Pte Ltd ACMV System 2024 Supply Labour Tools to Install Hyena and Vienna System
Expand Construction Pte Ltd ACMV System 2024 Laboratory Gases Installation
SNK (Asia Pacific) Pte Ltd ACMV System 2023 ACMV Duct Work for Phase 3&4
SNK (Asia Pacific) Pte Ltd ACMV System 2023 SIN 067 BBCS+PHASE1 - AMAZON DC SIN 67 FOR AC DUCT WORK & MV DUCT WORK
SNK (Asia Pacific) Pte Ltd ACMV System 2023 Phase-1 & BBCS Sin67 - CHW PIPE JOINT , CHILLED , PUMP & TANK INSULATION WORK
SNK (Asia Pacific) Pte Ltd ACMV System 2023 ACMV DUCT WORK INSTALLATION FOR LEVEL 2 - PHASE 2 (SIN 67)
SNK (Asia Pacific) Pte Ltd ACMV System 2023 SIN 67 BBCS+PHASE1+2 - ACMV Site Foaming Works for Phase 2
SNK (Asia Pacific) Pte Ltd ACMV System 2023 ACMV SITE FOAMING WORKS FOR PHASE 2 - SIN 67 BBCS+PHASE1+2
SNK (Asia Pacific) Pte Ltd ACMV System 2023 ACMV DUCT WORK INSTALLATION FOR PACKAGE B AT LEVEL 1 (OSP BUILDING) - PFIZER
SNK (Asia Pacific) Pte Ltd ACMV System 2023 Supply & Installation of Additional Sfety Mesh in AHU Gantry for BBCS+PHASE 1+2
SNK (Asia Pacific) Pte Ltd ACMV System 2023 Supply & Installation of Additional Sfety Mesh in AHU Gantry for Phase 3+4
TOTAL FACILITY ENGINEERING PTE LTD ACMV System 2022 INSTALLATION OF COMPRESSOR AIR PIPELINE & PROCESS VACUUM PIPELINE FOR CLASS 1K CLEAN RM
TOTAL FACILITY ENGINEERING PTE LTD ACMV System 2022 DUCTWORK & CHILLED WATER PIPE WORK FOR CLEAN RM , SERVER RM , OFFICE AREA & CORRIDOR
SNK (Asia Pacific) Pte Ltd ACMV System 2022 PU INSULATION & DRIP TRAY FOR CWS PIPE (SIN 67)
SNK (Asia Pacific) Pte Ltd ACMV System 2022 ACMV DUCT WORK FOR 7-STOREY DATA CENTRE (SIN 67)
SNK (Asia Pacific) Pte Ltd ACMV System 2022 GOOGLE - WEN 3 PROJECT LYW PHASE 1A ZONE 3 - HYENA & VIENNA INSTALLATION - LOK YANG WAY
SNK (Asia Pacific) Pte Ltd ACMV System 2022 WEN 3 PROJECT LYW PHASE 1A ZONE 3 - MV DUCT WORK INSTALLATION FOR LEVEL 1 CHILLER ROOM & LEVEL 4 GEN ROOM
SNK (Asia Pacific) Pte Ltd ACMV System 2022 HYENA & VIENNA INSTALLATION FOR ZONE 4 - LOK YANG WAY
Crawfurd Hospital ACMV System 2021 Installation of Quench Pipe & Emergency Exhaust Air System at CRAWFURD Hospital
Teambuild Engineering & Construction Pte Ltd ACMV System 2021 SUPPLY AND INSTALLATION OF FIRE-RATED VENT DUCT
SNK (Asia Pacific) Pte Ltd ACMV System 2021 ALMAC FUTURE EXPANSION FOR REFRIGERANT & DRAIN PIPE WORK
SNK (Asia Pacific) Pte Ltd ACMV System 2021 ALMAC FUTURE EXPANSION FOR DUCT WORK
SNK (Asia Pacific) Pte Ltd ACMV System 2020 WEN 3 PROJECT LYW PHASE 1A ZONE 3 - MV DUCT WORK INSTALLATION FOR LEVEL 1 CHILLER ROOM & LEVEL 4 GEN ROOM
SNK (Asia Pacific) Pte Ltd ACMV System 2020 INSULATION FOR CHOCOLATE TANKS & PU INSULATION WITH ALUMINIUM JACKETING FOR CHILLER PIPE AT MEIJI SEIKA - TUAS
SNK (Asia Pacific) Pte Ltd ACMV System 2020 GOOGLE-WEN3 PROJECT LYW PHASE 1A C&S + ZONE 1 ADDITIONAL & ALTERATION DUCTING WORK AT BATTERY ROOM
SNK (Asia Pacific) Pte Ltd ACMV System 2020 SINGLE-USER HI-TECH DATA PROCESSING & COMPUTING FACILITY DEVELOPMENT AT JUNCTION OF JURONG WEST AVENUE 2 (Z7)
SNK (Asia Pacific) Pte Ltd ACMV System 2020 GOOGLE-WEN3 PROJECT LYW PHASE 1A C&S + ZONE 2 INSTALLATION OF HYENA & VIENNA FOR ZONE 2 - LEVEL 3
ITS SCIENCE & MEDICAL PTE LTD ACMV System 2020 ACMV & P&S WORK SYSTEM INSTALLATION FOR 1 LAB ROOM & OFFICE AREA
SNK (Asia Pacific) Pte Ltd ACMV System 2019 SINGLE-USER HI-TECH DATA PROCESSING & COMPUTING FACILITY DEVELOPMENT AT JUNCTION OF JURONG WEST AVENUE 2 (Z5)
SNK (Asia Pacific) Pte Ltd ACMV System 2019 GOOGLE-WEN3 PROJECT LYW PHASE 1A C&S + ZONE 1 INSTALLATION OF HYENA & VIENNA FOR ZONE 1 - LEVEL 2
AFPD PTE LTD M&E 2023 Replacement of Heat Exchanger for RTO # 1
AFPD PTE LTD M&E 2023 RTO 1 & 2 & THC SYSTEM MAINTENANCE SERVICE FOR 1st Jan 2023 ~ 31st Dec 2023 - AFPD
C&W Services ( S ) Pte Ltd M&E 2025 Replacement of Dehumidifier System
C&W Services ( S ) Pte Ltd M&E 2024 Installation of ductile iron domestic water pipe
ITS Science & Medical Pte Ltd M&E 2022 INSTALLATION OF WASTE WATER PIPE & PUMP SYSTEM
National University of Singapore M&E 2022 P&S System and Fire Hydrant System Installation at NUS-COM 4
National University of Singapore M&E 2021 FIRE HYDRANT SYSTEM INSTALLATION
Total Facility Engineering Pte Ltd M&E 2022 Replacement of RTO Heat Exchanger
GREATEARTH CORPORATION PTE LTD M&E 2020 INSTALLATION OF ELECTRICAL WIRING WORKS AND PLUMBING & SANITARY WORKS (C15)
UBITECH HUB Pte Ltd Renovation Work 2024 Reinstatement works level 6 Starhub Green
UBITECH HUB Pte Ltd Renovation Work 2023 Design and Built for Foodcourt at 67 Ubi