PROJECT REFERENCE

M&E

Owner/Client/MainCon System Year Project Description
SNK (Asia Pacific) Pte Ltd ACMV System 2024 Supply Labour Tools to Install Hyena and Vienna System
SNK (Asia Pacific) Pte Ltd ACMV System 2024 Supply Labour Tools to Install Hyena and Vienna System
Expand Construction Pte Ltd ACMV System 2024 Laboratory Gases Installation
SNK (Asia Pacific) Pte Ltd ACMV System 2023 ACMV Duct Work for Phase 3&4
SNK (Asia Pacific) Pte Ltd ACMV System 2023 SIN 067 BBCS+PHASE1 - AMAZON DC SIN 67 FOR AC DUCT WORK & MV DUCT WORK
SNK (Asia Pacific) Pte Ltd ACMV System 2023 Phase-1 & BBCS Sin67 - CHW PIPE JOINT , CHILLED , PUMP & TANK INSULATION WORK
SNK (Asia Pacific) Pte Ltd ACMV System 2023 ACMV DUCT WORK INSTALLATION FOR LEVEL 2 - PHASE 2 (SIN 67)
SNK (Asia Pacific) Pte Ltd ACMV System 2023 SIN 67 BBCS+PHASE1+2 - ACMV Site Foaming Works for Phase 2
SNK (Asia Pacific) Pte Ltd ACMV System 2023 ACMV SITE FOAMING WORKS FOR PHASE 2 - SIN 67 BBCS+PHASE1+2
SNK (Asia Pacific) Pte Ltd ACMV System 2023 ACMV DUCT WORK INSTALLATION FOR PACKAGE B AT LEVEL 1 (OSP BUILDING) - PFIZER
SNK (Asia Pacific) Pte Ltd ACMV System 2023 Supply & Installation of Additional Sfety Mesh in AHU Gantry for BBCS+PHASE 1+2
SNK (Asia Pacific) Pte Ltd ACMV System 2023 Supply & Installation of Additional Sfety Mesh in AHU Gantry for Phase 3+4
TOTAL FACILITY ENGINEERING PTE LTD ACMV System 2022 INSTALLATION OF COMPRESSOR AIR PIPELINE & PROCESS VACUUM PIPELINE FOR CLASS 1K CLEAN RM
TOTAL FACILITY ENGINEERING PTE LTD ACMV System 2022 DUCTWORK & CHILLED WATER PIPE WORK FOR CLEAN RM , SERVER RM , OFFICE AREA & CORRIDOR
SNK (Asia Pacific) Pte Ltd ACMV System 2022 PU INSULATION & DRIP TRAY FOR CWS PIPE (SIN 67)
SNK (Asia Pacific) Pte Ltd ACMV System 2022 ACMV DUCT WORK FOR 7-STOREY DATA CENTRE (SIN 67)
SNK (Asia Pacific) Pte Ltd ACMV System 2022 GOOGLE - WEN 3 PROJECT LYW PHASE 1A ZONE 3 - HYENA & VIENNA INSTALLATION - LOK YANG WAY
SNK (Asia Pacific) Pte Ltd ACMV System 2022 WEN 3 PROJECT LYW PHASE 1A ZONE 3 - MV DUCT WORK INSTALLATION FOR LEVEL 1 CHILLER ROOM & LEVEL 4 GEN ROOM
SNK (Asia Pacific) Pte Ltd ACMV System 2022 HYENA & VIENNA INSTALLATION FOR ZONE 4 - LOK YANG WAY
Crawfurd Hospital ACMV System 2021 Installation of Quench Pipe & Emergency Exhaust Air System at CRAWFURD Hospital
Teambuild Engineering & Construction Pte Ltd ACMV System 2021 SUPPLY AND INSTALLATION OF FIRE-RATED VENT DUCT
SNK (Asia Pacific) Pte Ltd ACMV System 2021 ALMAC FUTURE EXPANSION FOR REFRIGERANT & DRAIN PIPE WORK
SNK (Asia Pacific) Pte Ltd ACMV System 2021 ALMAC FUTURE EXPANSION FOR DUCT WORK
SNK (Asia Pacific) Pte Ltd ACMV System 2020 WEN 3 PROJECT LYW PHASE 1A ZONE 3 - MV DUCT WORK INSTALLATION FOR LEVEL 1 CHILLER ROOM & LEVEL 4 GEN ROOM
SNK (Asia Pacific) Pte Ltd ACMV System 2020 INSULATION FOR CHOCOLATE TANKS & PU INSULATION WITH ALUMINIUM JACKETING FOR CHILLER PIPE AT MEIJI SEIKA - TUAS
SNK (Asia Pacific) Pte Ltd ACMV System 2020 GOOGLE-WEN3 PROJECT LYW PHASE 1A C&S + ZONE 1 ADDITIONAL & ALTERATION DUCTING WORK AT BATTERY ROOM
SNK (Asia Pacific) Pte Ltd ACMV System 2020 SINGLE-USER HI-TECH DATA PROCESSING & COMPUTING FACILITY DEVELOPMENT AT JUNCTION OF JURONG WEST AVENUE 2 (Z7)
SNK (Asia Pacific) Pte Ltd ACMV System 2020 GOOGLE-WEN3 PROJECT LYW PHASE 1A C&S + ZONE 2 INSTALLATION OF HYENA & VIENNA FOR ZONE 2 - LEVEL 3
ITS SCIENCE & MEDICAL PTE LTD ACMV System 2020 ACMV & P&S WORK SYSTEM INSTALLATION FOR 1 LAB ROOM & OFFICE AREA
SNK (Asia Pacific) Pte Ltd ACMV System 2019 SINGLE-USER HI-TECH DATA PROCESSING & COMPUTING FACILITY DEVELOPMENT AT JUNCTION OF JURONG WEST AVENUE 2 (Z5)
SNK (Asia Pacific) Pte Ltd ACMV System 2019 GOOGLE-WEN3 PROJECT LYW PHASE 1A C&S + ZONE 1 INSTALLATION OF HYENA & VIENNA FOR ZONE 1 - LEVEL 2